
Brockwood Park School Pavilions Project – Drilling the Foundations (350/365), originally uploaded by :Duncan.
The holes for the foundation supports need to be drilled as far as eight meters down to the chalk bedrock.
The holes for the foundation supports need to be drilled as far as eight meters down to the chalk bedrock.